CE certification for warehouse equipment comes down to one sentence: it is a manufacturer's declaration backed by paperwork, not an approval stamped by Brussels. From January 20, 2027, the rulebook changes from the Machinery Directive to the EU Machinery Regulation, effective the same day with no transition period. Start now and the timing works. This article runs in my usual order: the conclusion, the why, the steps, and the mistakes.
Too many people treat CE certification as an exam: hire an agency, pay a fee, wait for a certificate. That understanding is wrong at the root. The CE marking says the equipment meets the applicable EU legislation and can circulate freely in the internal market. It is not a quality mark, and it is not an official approval. The responsibility stays with the manufacturer, before and after 2027.
Pin down the timeline first. The current Machinery Directive is 2006/42/EC, in force for almost 20 years. Its replacement, Regulation (EU) 2023/1230, was adopted on June 14, 2023 and applies in full from January 20, 2027. The 42-month transition ends on that day, with no grace period for new machines. Machinery placed on the market before that date under the old directive stays lawful and does not need re-certification. What counts is the date of first placing on the market, not the contract signature date.
CE Certification Starts With Knowing Which Rules Apply
I have seen this mistake three times. In the autumn of 2025, a conveyor project shipped to Hamburg, Germany. The goods arrived at the port, and the customs broker asked for the declaration of conformity and the technical file. The file cited the Machinery Directive only and left out the EMC Directive. The whole shipment sat at the port for two extra weeks, and the go-live slipped by two weeks with it. Nothing was wrong with the equipment. The paperwork stopped it.
The first gate is listing every piece of legislation that applies. Warehouse automation equipment rarely falls under one law. The machine itself falls under the machinery rules. Electrical equipment falls under the EMC Directive 2014/30/EU and the Low Voltage Directive 2014/35/EU. Anything with a wireless function falls under the Radio Equipment Directive 2014/53/EU as well. One AMR ticks all three boxes, so the legislation list is long by nature. Leave one out and everything downstream is rework.
The second task is deciding what the equipment actually is. A complete AMR or a conveyor line with its controls is a machine. A conveyor without controls is partly completed machinery: it gets a declaration of incorporation and no CE marking. Several interconnected machines running together, a conveyor plus a stacker crane plus a palletizing cell, form an assembly of machinery, and the assembly needs its own risk assessment and its own declaration. Get the identity wrong and every document is wrong.
The third task is naming the responsible party. Whoever places the equipment on the market is the manufacturer. An integrator that assembles machines from several suppliers into one line is the manufacturer of that line. A customer that modifies equipment on site can move that responsibility onto itself, and I cover that trap in the mistakes section below.
The CE Certification Paper Trail: Four Documents That Decide Everything
Four pieces, in a fixed order. Skip one and the CE certification does not stand. The order cannot be rearranged: risk assessment first, technical documentation second, declaration of conformity third, marking last.
Risk assessment follows the EN ISO 12100 method. Walk the whole lifecycle: transport, installation, commissioning, normal operation, maintenance, decommissioning. List every hazard at each stage and assign a protective measure to each one. Conveyors follow EN 619, electrical systems follow EN 60204-1, and safety-related control systems follow EN ISO 13849-1 or EN 62061. Harmonised standards cited in the Official Journal of the EU give a presumption of conformity for the requirements they cover. One caution: citation of standards under the new Regulation is still in progress, so check the Official Journal list and do not blindly reuse the old directive's list.
Technical documentation is the second piece, and the most underestimated one. It holds the design drawings, the risk assessment records, the test reports, the list of applied standards, and the instructions. Keep it for 10 years from the date the equipment is placed on the market. Ten years is not a suggestion, it is written into the Regulation. An incomplete file is the same as no certification: when something goes wrong and you cannot produce the documents, the liability is yours.
The EU declaration of conformity is the third piece, a single page signed by the manufacturer, declaring that the equipment meets every applicable piece of legislation listed on it. From 2027 it names only the manufacturer and, where one is appointed, the authorised representative. The instructions travel with the equipment in the language of the country of use, and from 2027 they may be supplied digitally.
Marking is the last step. The CE marking goes on the equipment itself, with rules on size and placement. It goes on only after the first three pieces are complete. Mark first and finish the paperwork later is the most common way to do this backwards.
When is a notified body required? The decision table is short:
| Situation | Route |
|---|---|
| Equipment is not in the six high-risk categories of Annex I Part A | Self-declaration, no notified body |
| In the list, but fully built to harmonised standards | Self-declaration, no notified body |
| In the list, and not fully built to harmonised standards | Notified body mandatory: EU type examination or unit verification |
| Partly completed machinery | No CE marking, declaration of incorporation |
Paying a notified body does not buy a pass. It buys a conformity assessment, and the responsibility stays with the manufacturer. Fees and lead times follow the body's own quote and schedule, so put them as a separate line in the contract instead of burying them inside the equipment price.
Three Ways CE Certification Projects Go Sideways
The first mistake is collecting machine declarations and skipping the assembly assessment. Integrators love this one: the conveyor has a declaration, the stacker crane has a declaration, the AMR has a declaration, so the line must be covered. Wrong. Machines running together create risks no single machine has: material transfer between machines, shared safety functions, linked emergency stops. The whole-assembly risk assessment has to be redone, and a whole-assembly declaration has to be issued. A stack of machine declarations never substitutes for one assembly declaration.
The second mistake is selling partly completed machinery as a complete machine. A conveyor without controls or a lifting platform without safety devices is partly completed machinery. Declaration of incorporation and no marking is the only legal route. Mark it and ship it, and customs will catch it. Worse, the buyer discovers on site that controls and a safety assessment still need to be added, and the project slips by months.
The third mistake is an on-site modification that creates a new manufacturer. A customer adds racking to an AMR, changes its payload, reroutes its path, and calls it a small change. Article 18 of the new Regulation says otherwise: a substantial modification makes the modifier the manufacturer. The original declaration no longer covers the modified machine, and the risk assessment, the technical file, the declaration, and the marking all have to be redone. I have seen this mistake three times, and every time it surfaced days before delivery, when rework costs the most.
Here is the counterintuitive part: the hardest part of CE certification is not the engineering, it is the paperwork. The equipment is usually compliant long before the file is. Technical problems have standards to look up; paperwork problems depend on someone watching the list. In my projects the document checklist is always longer than the equipment list, and checking the documents always takes longer than commissioning the machines.
Go-live night checklist, ticked in order: is the legislation list complete; is the risk assessment done per EN ISO 12100; is the technical file complete, with the 10-year keeper named; is the declaration of conformity signed; are the instructions in the right language; is the CE marking affixed, and were the previous five items complete before it went on? Six boxes ticked, ship it. One box unticked, delay the shipment by a day rather than wait two weeks at the port.
By Lin Xiao, WMS Implementation Consultant