自动化 · 自动化立库
Your ASRS Inbound Gate Just Rejected a Pallet. Here's What That Rejection Really Costs.
An ASRS inbound gate rejects an oversized pallet — what does that 25-minute rejection really cost? This automation engineer's breakdown covers how light curtains and laser profile scanners build the 3D envelope at inbound, two real-world failures (a 3PL that saw 40+ rejections a day in peak season, and a food DC where a pallet that slipped through collapsed on the stacker crane forks), and an itemized cost table: rework labor, forklift moves, lost crane cycles, and peak-season cascade effects. The counter-intuitive takeaway: a rejection is good news — the pallet that gets through is the disaster. Whether to tighten or loosen gate tolerances comes down to your rejection-cause distribution, and the one number that decides if the money was well spent is rejects per thousand pallets.
2026-10-19