L’entrepôt en pratique · Entrepôts à l’étrangerAsie
China-Laos Railway at Vientiane: Thanaleng Dry Port, Gauge Change, and the Warehouse Play
The China-Laos Railway cut Kunming-Vientiane transit from 2-3 days to 10-12 hours, turning Vientiane's Thanaleng Dry Port into the warehouse node for Southeast Asia transshipment: gauge-change transloading, cold-chain block trains, and the backhaul math that decides who really profits. A 15-year trucking veteran runs the numbers.
2026-10-19