The Systems Lab · WMS Selection
WMS Migration Cutover Without Downtime: Dual Runs, Freeze Windows, and a Rollback That Works
A WMS migration cutover without downtime is not luck; it is scheduled: dual runs to prove the new system, a freeze window sized for the worst case, and a rollback plan with a named decision-maker. Two real cutover nights show what goes wrong and how a minute-by-minute runbook keeps trucks moving. Lao Mi covers data cleanup, the quiet point before the freeze, and why the person who can call a halt matters more than the rollback steps themselves.
2026-11-13