운영 컴플라이언스 · 소방 안전
Failed Inspection on Day One: The Coverage Blind Spots in Your Warehouse Sprinkler System
Last year I did a pre-inspection walkthrough for a 3PL warehouse in Rialto — 120,000 square feet, brand-new sprinkler system, everything supposedly ready. The fire marshal was on site for twenty minutes before he shook his head: failed. Two months of rework and close to $90,000 later, they finally passed. The cause? After handover, the operations team had added two levels to the racking. Nobody told the fire protection engineer.
2026-10-04